Synopsis
Technical
Reviews
Touring History
Quicktime movie
Photo Gallery

TECH SPECS:

Duration: 40 minutes

Schedule: ( Venue dependent )

Bump in: 5 hours. (Evening will be used to focus lights if necessary.)

Bump out time: 2 hours

Personnel requirements: Relevant engineer report for rigging points (if required)

Sound:
2 CD players
audio mixer
Stereo EQ rack
2 FOH speakers (1000 watts)
Appropriate cabling

Lighting: Only for night shows
1 Lighting control desk  
24 Channel dimmer 2Kw
48 Par64  CP62(medium flood)
4 lighting towers  5mt high
4 Frenels 1Kw
(looms, cables, clamps, frames etc.)

Truss Requirements:
*NB Dislocate will tour with truss throughout Europe and Australia.

Dislocate can provide truss for the rest of the world but freight often makes it cheaper to hire in each country. If you are providing truss we need:

Rigging truss: (box truss, 300*300 mm)
6 x 3m truss
2 x 2m truss
2 x corners

Dislocate can (and will in Europe and Australia) provide the turfers, guy wires, ratchets and slings to hold the truss up.

You will regardless need to provide:

6 weights 1000 kg to base truss OR It is possible to Dyna bolt to the floor OR peg into the ground this will be at the discretion of the council or Festival.

Erecting the structure
An area of 20m sq. must be free of obstacles for erection.

If we are using weights please see the plan for where they should be placed. It is preferable that we are there before the weights are positioned as they will be impossible to move once the truck that brings them leaves.

See truss plans. See lighting plans for evening performances.

home | repertoire | c.v. | news | contact
site design by Full Effect Design © 2004